# Forge: RFP and Bid Automation for Carriers | Hemut

Canonical page: https://hemut.com/f3-forge
Last updated: 2026-10-25
If this disagrees with the HTML page, the HTML page wins.

Forge

# Win more lanes at better rates, in a fraction of the time.

Forge turns your RFP process from a manual slog into a competitive advantage. Upload your sheet, seamlessly filter to the lanes you want, price with confidence based on your historical and market data, and submit. Turn a week long, heuristic process, into minutes of optimized bidding.

[Book a meeting](https://calendar.app.google/cWdBwYuiu2swPpkt7)

## RFP season shouldn't feel like this.

Every carrier and broker goes through the same painful RFP ritual. Manual spreadsheets, pricing debates, and lost lanes.

### YOUR CURRENT PROCESS

01

A shipper sends a 500-lane spreadsheet. You spend hours reformatting it just to make it readable

02

Your team debates pricing lane by lane — gut feel, scattered historical data, and whatever DAT says today

03

You bid on lanes you don't want because filtering takes too long to bother.

04

You submit late, underprice to be safe, or overbid and lose lanes you should have won

Forge eliminates every one of these steps. Upload your RFP, filter your lanes, price with data, and submit — in the time it used to take just to reformat the spreadsheet.

## Four steps. One competitive advantage.

_PDF__✦__DOC_**Formatting Requirements**

All Bids (9)

Origin CityOrigin St.Dest. CityDest. Prov.LaneUnit

CEDAR RAPIDSIACASA GRANDEAZ7PFNZ

DALLASTXORLANDOFL5GQXY

SEATTLEWAMIAMIFL12RLPK

STEP 1 - UPLOAD

Drop in the shipper's RFP — any format, any size. Forge auto-formats the spreadsheet instantly. No manual cleanup, no reformatting, no wasted hours before you've even started.

All Bids (7)

Origin CityOrigin St.Dest. CityDest. Prov.LaneUnit

CEDAR RAPIDSIACASA GRANDEAZ7PFNZ

DALLASTXORLANDOFL5GQXY

SEATTLEWAMIAMIFL12RLPK

PHOENIXAZATLANTAGA10NMQS

PORTLANDORSALT LAKE CITYUT6JXYD

Auto Filter

STEP 2 - FILTER

Slice through hundreds of lanes in seconds. Filter by region, volume, equipment type, or any criteria that matters to your network. Only bid on lanes you actually want to win.

Selected Bids (4)

Origin CityOrigin St.Dest. CityDest. Prov.LaneUnit

CEDAR RAPIDSIACASA GRANDEAZ7PFNZ

DALLASTXORLANDOFL5GQXY

SEATTLEWAMIAMIFL12RLPK

Checking Live MarketCalculating PricesFinalizing Confident Bids

STEP 3 - PRICE

Forge automatically calculates pricing for every lane — pulling from live market data, your historical lane performance, and your own pricing methodology. Confident bids. Every time.

All Bids (9)

Origin CityOrigin St.Dest. CityDest. Prov.LaneUnit

CEDAR RAPIDSIACASA GRANDEAZ7PFNZ

DALLASTXORLANDOFL5GQXY

SEATTLEWAMIAMIFL12RLPK

Most ProfitableClosest to TargetLowest Market Volatility**Submit Bid**

STEP 4 - SUBMIT

Your bid is ready. Submit while your competitors are still opening their spreadsheets. Speed is a competitive advantage, Forge gives it to you.

## Your pricing methodology, built in.

Forge doesn't apply generic market rates. It learns your pricing logic and applies it consistently across every lane — so every bid reflects how your operation actually prices freight.

![A dollar symbol surrounded by a circular arrow](/assets/forge-page/pricing-icon.png)

## Bid faster. Win more. Leave less on the table.

![A freight pricing dashboard](/assets/forge-page/pricing-overlay.svg)

**64%**less time spent on each sheet

**1.4x**win rate increase on lanes bid

**∞**lane opportunities to explore

We don't sell software. We drive outcomes.

## Up and running before your next RFP lands.

Forge doesn't require a lengthy implementation. You connect your data, set your pricing methodology, and start **winning lanes**

**01.**

### CONNECT YOUR DATA

Forge pulls in your historical lane data and connects to live market rate feeds. The more data you bring, the sharper your pricing gets from day one.

**02.**

### SET YOUR PRICING METHODOLOGY

Work with the Hemut team to configure your pricing logic in Forge — your margins, your lane preferences, your risk tolerance.

**03.**

### START BIDDING

When your next RFP comes in, you upload, filter, price, and submit. What used to take hours now takes minutes, and you win more freight at better rates.

## Pricing built around your RFP volume.

Forge is scoped to your operation and bidding volume. Book a call and we'll walk you through exactly what it costs and what it covers — no surprises.

[Book a meeting](https://calendar.app.google/cWdBwYuiu2swPpkt7)

## See Forge on your next RFP

[Book a meeting](https://calendar.app.google/cWdBwYuiu2swPpkt7)
